Modern bright apartments with a thoughtful layout respond to the latest trends in housing. Residence Na Mariánské cesty offers its residents maximum comfort. We carefully select first-class materials, and before the construction is completed, we will be happy to meet your individual requirements for modifications.
Normal standard design
As part of the standard design, each client can choose from a specified range of tiles, floor coverings and interior doors from our partners by a specified date. If the client does not make a material selection and sign the specification by the deadline, the selection will be made by DOMOPLAN.
Additional charge premium design
As part of the additional design, the client can choose from a wide range of premium domestic and foreign-made surfaces, floor tiles, sanitary fittings, floor coverings and interior doors from our partners. For the selected extra design, the client will be charged an additional fee corresponding to the difference between the price of the material, the cost of assembly including shipping and the cost of the lump sum to discuss the client's change. In the case of more complex tiling and flooring installations or changes to the installation of sanitary equipment, in some cases an additional charge may be made for the increased labour intensity involved in the installation and other work required.
DOMOPLAN also offers the realization of individual modifications at the client's request. This can be small individual changes, such as partial changes to partitions, changes in the electricity distribution, the location of switches, sockets, central heating units, the connection of two housing units into one large spacious or even two-storey apartment. However, these changes must first be technically assessed, then designed and subsequently the price calculation is made.
Each type of client change can only be implemented up to a certain stage of construction, so they are limited by predefined deadlines. For this reason, clients are advised to arrange changes as early as possible. The deadlines for reporting client changes vary for each project and are always definitively determined during construction. However, in general:
- client changes within the scope of changes to the wiring in monolithic reinforced concrete structures must be reported no later than 45 days before the start of concreting the ceiling above the first floor;
- client changes within the scope of layout changes must be reported no later than 45 days prior to commencement of brickwork construction;
- client changes within the scope of surface changes must be reported no later than 60 days prior to commencement of tiling.
After submitting your idea of the form of the client change and payment of the fee for discussing the client change, a price calculation will be prepared. The price for the implementation of a client change is always determined individually depending on the recommended retail prices of goods from our contractual partners and the prices of other related items. Once you have received the price quotation, you will be able to decide whether you wish to implement the client change. The change is negotiated by way of an amendment to the Future Unit Ownership Transfer Agreement.
The client change is made only after the payment of the full price of the change according to the amendment.
DOMOPLAN reserves the right to refuse any change.